Use this with MSE Walls and Gabion Wall Special Provisions. Coordinate with RCOC whether to include Geotextile Separator, Non-Woven, RCOC and/or Road Grade Biaxial Geogrid, RCOC and/or Geotextile, Stabilization, Non-Woven, RCOC. You will not be able to use geotextiles with sand however. For Subgrade, Undercutting, Class II use MDOT Std Pay item. If used in contract use a minimum of 500 Cyd as a directed quantity. This spec is to be used on projects which have driveway, side street, or sidewalk reconstruction. If performing ditch maintenance use the standard MDOT pay item. This spec is only to be used if relocating a ditch or constructing a new ditch. Do not use this spec if Excavation, Earth in included in the contract. This spec is to be used to remove wood bollard posts when Excavation, Earth is not included in the contract. This work shall be completed where the the existing location of potential underground conflicts with proposed work cannot be readily identified horizontally and/or vertically by the utility owner. Consult with RCOC before use.Įxploratory Investigation, Utility, RCOC (Cyd)Įxploratory, Investigation, Utility, Vertical, RCOC (Foot) Use in any projects which require the removal of significant utilities. To be used on concrete overlay projects only. Use this spec in conjunction with Flowable Fill, Non-Structural (Cyd) and Sewer, Bulkhead, _ inch (Ea). Consultants should not use this spec unless authorized by RCOC. This spec shall be used on projects where specific tree removal must be done prior to the start date of the project under a separate tree contract. Consultants should not use this spec unless authorized by RCOC.įor use in the tree contract. This spec shall be used on projects where trees and clearing must be done prior to the start date of the project under a separate tree contract. This spec shall be used on projects where trees were previously removed as a precaution to protect Federally protected species. Include in every project in which the contractor will be removing vegetation as well as stumps. If your project is removing trees with diameter 8" or more this FUSP must be included.Ĭhanges clearing limits from MDOT's 10 ft to 3 ft beyond Slope Stake Line or ROW. This specification only has to do with Wood Disposal Agreements and Merchantable Timber. Use when requested by RCOC Design Department or RCOC Environmental Department. If you don't have money in these permits then use this special provision, but delete the pay item line. Use this special provision in lieu of the Notice to Bidders "permits and fees to be reimbursed for permit fees". Make sure review requirements for other items in the proposal are not less than 10 or 20 days. ![]() Can be used on bridges, culverts, roads, watermains, concrete, utilities, traffic signals, etc. Use on all projects requiring shop drawings for construction. Use on projects with work on CSX property. Work on railroad property-CSX Transportation, Inc. Updated language in 104.13 to include updates to the project inspection form submittal process. Use on all projects with custom face permanent signage. Requires the Contractor to provide shop drawings of all custom face layout permanent signage. ![]() Use when two projects under one contract are similar but separate special provisions for the project/Contract. Used to clarify information that is not clear to the contractor. Update utility companies and conflicts per project. ![]() This spreadsheet utilizes tables and can be filtered as needed. It is a tool to use with the Maintaining Traffic SP. It is a refined list of typicals RCOC would generally use with notes to help the user, including sign quantities. This spreadsheet was made from the Work Zone section of the Michigan Department of Transportation Traffic and Safety/Standards and Special Details. DocumentCenter/View/10372 /DocumentCenter/View/10372 /DocumentCenter/View/11325 /DocumentCenter/View/11386 20MOTĮntire document has been updated. For local let projects, rename file "ADMIN4_PCL". Road Commission for Oakland County FUSP template provided in Microsoft Word. This is a Word document of the SECS notes that should be put in the SECS sheets. Important: You must go through this entire documents and makes changes as appropriate to make it project specific. This is a Word document on General Notes that should be put in the General Plans.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |